OPAL
General Meeting Agenda - February 16, 1999
Minutes are in italics.
Announcements
-
Soldering/Harness party on Wednesday
for pico and accel circuitry
-
Can we put a phone in 150?
Subsystem Discussion
-
General
-
Parts list for flight hardware:
bolts, spacers, connectors, etc.
-
Darpa money?
-
Flight hardware review with
Sandy
-
System Integration
-
Ogiwed updates, printouts, and
electronic copies.
-
Accelerometers / Magnetometer
-
Ops guide.
-
Move temp sensor to power regulators.
-
Communications
-
Set up time to meet with mentorst.
-
Test beacon with beacon receiving
station
-
Fix up portable radio and get
a system going
-
Figure out TNC initial transmit
problem
-
CPU
-
Mux line code change for picos
-
Rewire Woody Allen CPU to handle
new changes
-
Swap in new CPU chip
-
Figure out TNC initial transmit
problem
-
Launch Interface
-
Design brackets to depress Opal
sep switches.
-
Picosatellite Launcher
-
Work through delivery dates.
-
Order flight tubes
-
Check on NEA order
-
Update on launcher instrumentation.
-
Power
-
Solar panel update? Need
people to help with panels.
-
Set up flight power tray in
clean room
-
Structure
-
Do we need to rebuild the pieces
that at Weber?
-
Transport case for Opal needs
to be designed and built
-
Cover sheets for solar panels
-
Testing
-
JAWSAT
-
Update
-
Pico integration at last moment?
Check on that date.
-
Antennas.
-
Trickle charge...may need to
build our own especially for pre launch pad waiting at Weber
-
Ops
-
Update.
-
Read it! http://ssdl.stanford.edu/squirt1/ops/mog.html
-
S:\briguy\OPAL\OPAL mission
ops.doc
-
Test routine for each subsystem
|