Payload
Integration Working Group Weekly Telecon Notes
September 11, 1998
(From CAST minutes)
-
Marina: Agreed to keep &
e-mail minutes of PIWG calls
-
Marina: OSSS needs to settle
trickle charge issues. (FALCONSAT really require continuous up to launch?
Cable length and type, now off-set and starts above ground ~ 150 ft length.
ASU re-iterated may build one charger for everyone).
-
Williford: Orbital can monitor
voltage for FALCONSAT.
-
R. Smith: Can FALCONSAT separation
system use asymetrical but repeated 3-hole pattern per FAX Sketch to USAFA?
Answer: Chesley = yes, but will confirm.
-
R. Smith: CAST database and
associated FTP site on-line. Arranging to flag and date changes. Q: effect
on ICDs?
-
Schoneman: Orbital needs ejected
PL masses and velocities ASAP. Action: R. Smith OSSS.
-
Chesley: USAFA Orbit understood
as Sun Sync. 700km @98.6deg and with equator crossing at 0800 to
be determined by Starfire sighting needs. USAFA action to publish requirements.
OSSS comment= required ASAP to define power generation system, and
orbit license.
-
R. Smith: Will send as-is drawing
package (paper copy of A-CAD-13) ASAP to Orbital (Schoneman)
CAST ACTIONS:
-
M. Wood: OSSS needs to settle
trickle charge issues. (FALCONSAT really require continuous up to launch?
Cable length and type, now off-set and starts above ground ~ 150 ft length.
ASU re-iterate will build on charger for everyone).
-
R. Smith: Can FALCONSAT separation
system use asymetrical but four times repeated 3-hole pattern per FAX Sketch
to USAFA? Answer: Chesley = yes, but will confirm.
-
R. Smith: CAST database and
associated FTP site on-line. Arranging to flag and date changes. Q: effect
on ICDs?
-
R. Smith: Schoneman: Orbital
needs ejected PL masses and velocities ASAP.
-
R. Smith: Will send as-is drawing
package (paper copy of A-CAD-13) ASAP to Orbital (Schoneman)
|