Payload Integration Working Group Weekly Telecon Notes 
November 6, 1998   

OPAL Action Items 

  • send names and arrival time for VAFB PIWG to Buckley;  need name, SSN, DoB, citizenship for all that will be coming
  • send mass properties listing to OSSS, cc: Buckley for OPAL, interface after separation, sep. force time duration, and sep. velocity
  • send revised schedule with margin to Buckley
  • need to specify which parts of the mass model are flight hardware when we send mass model to WSU
  • send frequency and wattage of beacon transmit to OSC to verify if it will be a problem for OPAL to initially transmit a beacon and then not transmit for 30 minutes
Misc. Notes 
  • launch environments in rev. 2 of OSC user's manual are still good with their calculations, with the addition of 14g longitudinal load at 1st stage light-up