Main Menu

OPAL Home
Quick Facts
Mission
System Overview
Satellite Subsystems
Schedule
Personnel
Meetings
Sponsors
Photo Gallery
Training Guides
Back to SSDL
 
Final Construction

The final bolts are tightend and epoxied on Opal.
 
 
  • Jamie's glad it's all locked up!
  • Greg works on beacon testing.
  • Jamie and Bryan work on aligning the final solar panel.
  • Jamie and Bryan work on aligning the final solar panel.
  • The last solar panel connector is attached to the power tray.
  • The last solar panel connector is attached to the power tray.
  • Bryan Palmintier grins during final panel attachment.
  • Closeup of solar panel connectors
  • Alignment of last panel.
  • Good elbow shot eh? The 386 PC makes a good stand for Opal.
  • The final internal screws that hold the solar panel electrical connector are expoxied down.
  • Jamie torques tight the final screw.
  • The final bolts are being attached to Opal.
  • The final bolts are being attached to Opal.

  •