|
|
Opal Operations
These are screens shots during an Opal contact. The ops team is trying to figure out if a picosatellite has fired accidently. Thankfully, all picos were safe and sound in Opal awaiting the firing command.

|
Opal beacons.
|

|
Be careful of your software gurus. You never know what they're going to do!
|

|
Operator logging into Opal and getting status telemetry.
|

|
Jamie Cutler logs into Opal from the Big Dish.
|

|
Opal status screen. Things look good.
|

|
Opal status screen. Things look good.
|

|
Error summary of Opal.
|

|
Trying to get pico telemetry.
|

|
Jamie points out a data point that indicates pico firing. However the reference is bad indicating the circuitry is not on.
|

|
Screen shot of telemetry.
|

|
Screen shot of telemetry.
|
|