|
|
Dish Ops
The Opal ops team gets comfortable at the Big Dish. They also entertain some visitors.

|
Families look on during operations. XXX
|

|
Jamie gives an overview of the operations as he sets ups the station.
|

|
Greg and Jamie set up Opal's engineering model to do system testing.
|

|
A close up of the engineering model. Yes, it's a mess. But it works. Well most of the time. We're testing the comm link and some new commanding sequences.
|

|
Another view of the EM.
|

|
Screen shot of the solar panel currents.
|

|
Another view of the currents.
|

|
Different current data pre pico launch. Notice the slower spin rate.
|

|
View of magnetometer data.
|

|
Pre pico launch mags. Lower spinrate.
|

|
Opal orbital map.
|
|